韩国性爱视频,国产美女裸体,18禁视频在线看,黄色爱爱日本

Installation Basics

1,first of all the basic surface of the whole chisel hair. According to the specific circumstances, set out to play Ma or make sand pulp. Play the hemp surface: the use of standard horn, parallelism on both sides of the absolute difference shall not be greater than 0.03 ~ 0.05mm. Chiseled pimple must be greater than the pad length, width 10mm, the horn on the hemp of any position are horizontal and no warp. The horn will be coated with red and Dan powder, grinding in the Ma face, the color surface is not less than 70%. Production of sand slurry: the use of coarse river sand: # 525 Portland cement: water = 1: 1: 0.3, stirring evenly. Sand pulp to fight real, the upper horn level is not greater than 0.5mm.
2, horn preparation: horn arranged on both sides of the anchor bolts and the base frame of the bearing parts. The horn group is determined by the weight of the equipment, the load condition, the base frame size and the steel grade. The weight is not large, no impact load equipment, adjacent two sets of horn distance of 500 ~ 800mm, for heavy and impact load equipment, horn spacing of 300mm. Each group of horns not more than three, a pair of oblique pad iron count, each group only allowed a pair of oblique horn. Between the horn and the horn with a 0.05mm feeler check the depth of the plug does not exceed the length of 20% of the contact, oblique horn gradient is generally 1: 10 ~ 1: 20, thin edge thickness of not less than 4mm.
3, horn installation: horn can be stable and does not affect the case of secondary grouting, should be as close as possible to the anchor bolts. The thick horn is placed underneath the thin horn on it. Horn to reveal the base frame of not less than 10mm, but not beyond the edge of the foundation. According to the above requirements can be equipped with a high degree of installation to meet the needs of the horn group, the joints and horn on the bottom of the concrete foundation Ma and the bottom of the base frame clean. The horn placed in the process, to prevent sand and other debris into the bonding surface. When the foot bolts with strength, with a hammer hammer oblique pad thick side, so that the horn group evenly. After the equipment is correct and the anchor bolts have been tightened, the two sides of the horn are welded firmly. Horn installation points: there are processing bias oblique horn matching, to be carefully deployed, so that after the matching oblique horn, surrounded by the thickness of the same uniform; horns must not have a combination of defects, bumps or debris; Between the horn and platen, between the horn and the hemp should be closely integrated; pad iron evenly; anchor bolts after the base frame without stress due to uneven deformation.
师道之不传也久矣| 欧美综合| 日本熟妇乄Ⅹ乄日本少妇视频| 久久激情小说| 色哟哟精品。| 亚洲高清国产拍精品熟女| free小树林性少妇pics| 日韩精品专区AV无码| 日韩欧美入口| 张开腿舔视频| 成人午夜视频666| 夜夜爽77777妓女免费看| 日韩你懂得免费在线观看一区| 91丁香五月| 久久99青青精品免费观看| 精品久久人妻| 四虎影视成人永久免费观看视频| 91熟妇| 午夜福利在线| 凹凸不卡福利视频| 久久免视频线观看| 欧美日韩2| 人人大久久国产視| 国产色bb| 久久 亚洲 欧美| 久久精品人人做人人爽电影蜜月| 日韩成人午夜福利电影一区二区| 色婷婷在线播放| 久久亚洲婷婷五月| 日本花季传媒APP| 广灵县| 精品无码在线| 日韩 欧美 不卡| 青青草欧美| 亚欧在线| 久久人人搡人妻人人玩夜色av| 欧洲亚洲国产精品| 午夜精品久久18免费观看| 国产秋霞电影一二三区| 特BBBBBB视频欧美亚州视频| 久久久综合伊人AV三区|